I would say simulated a few data point (eg fit 10, 100, 1000 data points etc and get the width of 95%HDI), and fit a linear or log-linear model.
1 Like
I would say simulated a few data point (eg fit 10, 100, 1000 data points etc and get the width of 95%HDI), and fit a linear or log-linear model.